Large Talon Orders in Canada - 12/27/2004
Fujitec Canada, Inc. was recently awarded an order for 32 elevators, including 15 Talon drive models, for the Willam Osler Hospital. The hospital will be constructed in Brampton, Ontario.
The hospital, equipped with state-of-the-art medical equipment and over 600 beds, will be one of the largest medical facilities in Canada. The hospital is due for completion by the end of 2006.
In addition, Fujitec will supply and install seven elevators, including three Talon drive models, for the Four Seasons Centre for the Performing Arts that will be constructed in the heart of Toronto. (Shown above.)
The 5-story center, equipped with 2,000 seats, is designed for the performance of opera and ballet, and will be one of Canada’s premier art and culture facilities.